Roading contractor
Bay Of Plenty Pavement Renewal
Delivered approximately 17,000 m² of pavement rehabilitation and repairs within active transport corridors. The scope included failed pavement removal, granular reconstruction, asphalt reinstatement, compaction, testing and quality documentation.
17,000 m²approx. pavement rehabilitation
Live roadsworks within active transport corridors
Pavement rehabilitationAsphalt reinstatementQuality assurance
Roading contractor
Surfacing And Membrane Sealing
Delivered approximately 33,000 m² of tack coat application and 18,000 m² of membrane sealing, with trucking support. Our scope covered planning, resources, supervision, health and safety, physical works and quality assurance.
18,000 m²approx. membrane sealing
33,000 m²approx. tack coat application
Tack coatMembrane sealingTrucking support
Industrial client
New Commercial Carpark
Principal contractor
Constructed a 4,000 m² engineer-designed carpark. Works included foundation demolition, approximately 58 metres of stormwater pipe, granular pavement construction, two-coat chip sealing and an asphalt entrance.
4,000 m²engineer-designed carpark
58 mapprox. stormwater pipe
Demolition and drainagePavement constructionChip seal and asphalt
Quarry operator
Earthworks And Material Recovery
Principal contractor
Excavated and benched approximately 30,000 m³ of material. Processed and sorted approximately 15,000 m³ to recover around 5,000 m³ of suitable rip-rap, with stockpile management and removal of unsuitable material.
30,000 m³approx. excavated and benched
5,000 m³approx. suitable rip-rap recovered
Bulk earthworksMaterial processingResource recovery
Project referees and supporting certificates are available on request.